We understand how important it is to get your renovations completed on time particularly when the bathroom being constructed or renovated is used regularly. This is the reason we allocate professionals who are reliable and efficient to handle your renovations job for you so that all work from the planning to the finishing is completed within your time constraints.


Demolition. All remodeling jobs start with tearing out and removing elements that will be replaced. Depending on the level of your remodeling job, this can be a simple matter of removing old fixtures and flooring, or as complicated as removing everything down to the wall studs and floor joists. Either way, this can be hard work but it is not difficult, and most homeowners can do this work themselves to save money. Most demolition can be done in a weekend. You will need to rent a roll-off dumpster or arrange for a disposal company to take away a pile of demolition debris. 
Do you have a wedding or special occasion coming soon when you will be expecting guests? It is prime time now to get your powder room renovated through our in-demand powder room renovations services. We ensure that everything in your powder room looks new and refreshing so that guests can enjoy a pleasant experience during their stay at your house.
Given the complexity of bathrooms—multiple components in a compact space, not to mention all that water—doing the project right is a challenge. (See Remodeling Dos and Don'ts.) On a cost-per-square-foot basis, bathrooms are one of the most expensive spaces to remodel. But that doesn’t mean you have to spend a fortune. That’s where Consumer Reports’ Bathroom Remodeling Guide comes in. Our product testers have spent months rating the latest toilets, sinks, countertops, and other bathroom essentials to separate the winners from the also-rans. We’ve also interviewed designers, contractors, and real estate pros nationwide to find out what to include—and what to skip—on your bathroom-remodel wish list.  
Electrical rough-in. This is another task that should be left in the hands of pros unless you are one of the very few DIYers who are experts at it. A licensed electrician will run new circuits where required, install lighting and vent fans, and will arrange for the work to be inspected. Later, after the inspection is complete and the walls and ceilings are finished, the electrician will return to hook-up outlets, light fixtures, and fans. Two inspections are required: one at the rough-in phase, another after the final installation. 

No, this is not a requirement. Most people opt to stay out of the home (or leave for holidays) during the renovation job. Our team of professionals take the utmost care of your home while you are away and take strict security measures to ensure the maximum safety of your entire home during the renovation. If you choose to stay at your home, our team will respect your home and the privacy of all its members.
Our service is renowned for providing high-quality bathroom renovations for amazing prices. Even though the cost of individual projects can vary greatly, we can do a complete makeover of your old bathroom for as little as $10,000. If you will need just a re-installation/removal of appliances and fittings then these costs can be even lower. We guarantee you that Bathroom Renovations Sydney will always offer you the most affordable prices for your renovations job!
A DIY bathroom makeover is not complete without new floor tiles. But before you start grinding away with the grouting, use a mason’s chalk line to mark reference lines perpendicular (at a 90-degree angle) to the wall with the longest continuous line. This will allow you to keep your tiles in a straight line, avoiding the dreaded crooked tiling job.
The tank is concealed within a 2×6 wall that’s built in front of the existing plumbing wall. It does require some plumbing rerouting because the waste line runs through the wall instead of the basic floor-mounted toilet flange (see Photos 8 – 12). The toilet can be ordered with a wall-mounted access panel/flush button like ours or with the panel mounted on top of a half wall. A ‘chair carrier’ (Photo 11) comes with the toilet. This steel framework contains the toilet and operating mechanisms and is designed to support the weight of the toilet.
Toenail 2×6 blocks in the center of the shower 36 in. above the floor for the shower valve and 6 ft. 6 in. above the floor for the showerhead. Position the valve block so the plastic mud guard on the mixing valve will be flush with the finished wall surface. Attach the shower supply line and the hot and cold supply lines to the valve. Clamp the valve body and shower supply line to the blocks with copper pipe straps. Run copper water supplies to the new locations for the sink and toilet.
As with the cost, it is difficult to estimate the exact time that it will take for a bathroom renovations project since it depends on a variety of factors such as the size and requirements of the renovation. On average though, it takes anywhere between 2 – 4 weeks to complete a bathroom renovation with shorter projects that just need replacement/upgrade of appliances/fittings taking as little as 1 week. Our team here at Bathroom Renovations Sydney is highly efficient and ensures that minimum time is needed for your renovations project.
You’ll spend $3,000 to $8,000 on the typical remodel. Anywhere from 40 to 65 percent of a bath upgrade cost comes from labor. However, doing any project yourself means no insurance and added fees if something goes wrong. Hire a professional for any work you’re not comfortable doing, such as the plumbing and electrical. Consider the pros and cons of DIY vs professional bathroom remodeling.
×