The cheapest route of all also typically the one that takes the most time: doing all or most of the work yourself. A very (very) skilled DIYer with plenty of time and a group of willing friends and helpers may be able to finish a bathroom remodel nearly as fast as a general contractor, but very few homeowners fall into that category. And there is the issue of quality: good contractors will do the job professionally, while many DIY installations will be recognizable as the work of an amateur. 
For your remodeled bathroom to operate well, it’s critical to install vent and drain lines of the proper size and slope. Use a 2-in. line to drain the shower and 1-1/2-in. line to drain the sink. The vents for the sink and shower can be 1-1/2-in. pipes, but a toilet should be vented with at least 2-in. material. Make sure that the drain lines drop 1/4 in. for every foot of travel toward the main stack.
The wall behind the toilet can be almost any height. For a standard toilet height of 15 in., make the wall a minimum height of 43 in. If you’d like a higher toilet, make the wall that much higher. Or, make the wall go all the way to the ceiling. We built a short wall to conserve space and to create a shelf and a mirror alcove. The wall at the opposite end of the shower can be any height as well. We made it the same height as the toilet/sink wall so we could line up the accent tile and make a convenient shower shelf.
Before starting to renovate a bathroom, consider to determine your budget. The cost of remodeling a bathroom depends on the size, started from small to medium or master. Not only the bathroom, but the fixture price also depends on its size. Moreover, the fixture elements that you will probably need while remodeling a bathroom are new shower or bath, countertops, lighting, flooring, and cabinets.
Demolition. All remodeling jobs start with tearing out and removing elements that will be replaced. Depending on the level of your remodeling job, this can be a simple matter of removing old fixtures and flooring, or as complicated as removing everything down to the wall studs and floor joists. Either way, this can be hard work but it is not difficult, and most homeowners can do this work themselves to save money. Most demolition can be done in a weekend. You will need to rent a roll-off dumpster or arrange for a disposal company to take away a pile of demolition debris. 

With a DIY mind-set, the owners of this small master bathroom created a personal sanctuary on a budget. This Asian butcher table, found at an antiques shop, was repurposed for the vanity. The table maintains its authenticity with a simple above-counter sink. A new mirror adds a modern touch, while a pebble-tile "rug" on the floor adds texture and a spa-like accent.
Here at Bathroom Renovations Sydney, we provide you with the complete range of bathroom renovations services for modern bathrooms, luxurious bathrooms, small bathrooms, and traditional bathrooms. Our complete renovations services include, but are not limited to, planning, designing, remodeling, construction, appliances removal/installation, fittings removal/installation, tiling, and paint. You can choose any one of these services, or our entire assortment of services to enjoy peace of mind with your renovation.

Be adventurous. Design treatments that would look over the top in other parts of the home are fine in the powder room. Deep dark hues, such as burgundy and eggplant, play well in these small spaces. Not that adventurous? Limit dark hues or unusual colors to wall paint. Pricey materials such as vessel sinks, custom floor patterns, and stone counters won’t be as hard on your budget because you won’t need as much as you would in a larger bath.


As with the cost, it is difficult to estimate the exact time that it will take for a bathroom renovations project since it depends on a variety of factors such as the size and requirements of the renovation. On average though, it takes anywhere between 2 – 4 weeks to complete a bathroom renovation with shorter projects that just need replacement/upgrade of appliances/fittings taking as little as 1 week. Our team here at Bathroom Renovations Sydney is highly efficient and ensures that minimum time is needed for your renovations project.


Follow Fig. B, for the new drain/vent plan. The new shower drain is vented separately into the main stack (Photos 10, 12 and 13). Most bathrooms have the main stack positioned directly behind the toilet. The wall-mounted toilet shown here cannot be positioned directly behind the stack because there’s not room for the necessary elbows. If your stack is more than 12 in. to the side of the existing toilet, you can keep the same location for the wall-hung toilet. But if it’s directly behind it, you’ll need to swap the sink and toilet locations like we did.
There is no way around it: it costs more to remodel quickly than it does to take your time. This is primarily because a quick remodel really requires a general contractor (GC) to coordinate the project with various subcontractors (plumbers, electricians, tiling contractors), and you are paying for the general contractor's skill and experience. While it is possible for a homeowner to serve as his or her own general contractor—interviewing, hiring, supervising, and paying individual professionals to do their work in order—this is always a slower process than allowing a GC to coordinate his preferred subcontractors. Hiring your own subcontractors, though, can save you quite a bit of money, as you eliminate the time and overhead of the general contractor. 
We understand how important it is to get your renovations completed on time particularly when the bathroom being constructed or renovated is used regularly. This is the reason we allocate professionals who are reliable and efficient to handle your renovations job for you so that all work from the planning to the finishing is completed within your time constraints.
The job of installing our wall-mounted fixtures was tougher than it had to be, thanks to poor and contradictory one-size-fits-all instructions, metric fittings and duplicate and missing mounting parts. Prevent hard-to-fix future problems by test-fitting the actual fixtures when roughing in framing, plumbing and blocking to make sure everything will work out. Then finish the walls. When test-fitting, simulate finished floor and wall surfaces to get the clearances right.
Focus on durability. The surfaces and fixtures will likely get lots of wear and tear, especially if children use the room. Plastic laminate flooring and countertops are durable and inexpensive, plus the kids likely don’t care if they have high-end materials. As for fixtures, you still want high-quality construction, including all-brass parts and a PVD (physical vapor deposition) finish that resists scratches, but go with basic chrome, rather than pricier nickel or bronze. On the walls, choose an interior paint that resists mildew.
The cost of a bathroom renovation in Sydney can greatly change depending on your exact requirements e.g. Do you need structural changes? Do you need new accessories? However, an average bathroom renovations project that involves a complete makeover for your bathroom can vary between $15,000 to $25,000. We would still recommend that you get in touch with our representatives who can better understand your specific requirements and provide you with an accurate cost breakdown.
If your room is wider than the shower base, fur in the walls as needed to butt against the ends of the shower base (see Photo 14). Our bathroom is 6 ft. wide, so we added a floor-to-ceiling 2×6 wall at the showerhead end and a shorter 2×6 wall at the opposite end. We made that wall only 43 in. above the floor so we could use the top of the wall to hold shampoo and other shower supplies. The shower base usually comes with a special 2-in. drain fitting that you connect to the drain line (Fig. B).
A luxurious Mediterranean style provides traditional interiors combined with the current one. Its casual and relaxing methods lead to a picture of the mediterranean sea. The furniture often painted in Mediterranean colors like yellow, bright blue, and rust. Dark wood cabinets and colorful tile ceramic floor makes this bathroom correctly shows the design.
Tile the walls first, then the floor. When tiling around the window, keep the tile about 1/8 in. away from the glass block. Tile the floor, starting by carefully snapping center lines to lay out border strips and field tile. Work from those lines to get evenly spaced tiles throughout the floor. Grout the walls and floors but caulk the inside corners between floors and walls and where walls meet.

The wall behind the toilet can be almost any height. For a standard toilet height of 15 in., make the wall a minimum height of 43 in. If you’d like a higher toilet, make the wall that much higher. Or, make the wall go all the way to the ceiling. We built a short wall to conserve space and to create a shelf and a mirror alcove. The wall at the opposite end of the shower can be any height as well. We made it the same height as the toilet/sink wall so we could line up the accent tile and make a convenient shower shelf.
Focus on durability. The surfaces and fixtures will likely get lots of wear and tear, especially if children use the room. Plastic laminate flooring and countertops are durable and inexpensive, plus the kids likely don’t care if they have high-end materials. As for fixtures, you still want high-quality construction, including all-brass parts and a PVD (physical vapor deposition) finish that resists scratches, but go with basic chrome, rather than pricier nickel or bronze. On the walls, choose an interior paint that resists mildew.
There is nothing better than getting into a hot shower at the end of a long day. My husband and I have been wanting to do some remodeling to our master bathroom and I would love to have any one of these designs. They look so functional for their size and I love the shower doors in some of these designs! These have given me some great ideas, thanks for sharing!

Bathroom Renovations Sydney is a highly professional and reliable company. The team that they sent for my bathroom renovation was quite friendly, cooperative, and hard working. They hardly made a mess and ensured a clean working environment at all times. Everything went along very smoothly from the start and I am completely satisfied with the results that they have delivered. Thanks a bundle for the great service!

×