As with the cost, it is difficult to estimate the exact time that it will take for a bathroom renovations project since it depends on a variety of factors such as the size and requirements of the renovation. On average though, it takes anywhere between 2 – 4 weeks to complete a bathroom renovation with shorter projects that just need replacement/upgrade of appliances/fittings taking as little as 1 week. Our team here at Bathroom Renovations Sydney is highly efficient and ensures that minimum time is needed for your renovations project.
Splurge on the accessories. With so few accessories to consider, you can spend more on those you do need. “Invest in the faucet,” says Carolyn Cheetham, president of Design Works by Cheetham in Alberta, Canada. “It’s an opportunity to bring something fun and sculptural into the space.” Also, consider matching the faucet finish to other accessories in the space, such as the towel ring, mirror frame, and light fixture.
Splurge on the accessories. With so few accessories to consider, you can spend more on those you do need. “Invest in the faucet,” says Carolyn Cheetham, president of Design Works by Cheetham in Alberta, Canada. “It’s an opportunity to bring something fun and sculptural into the space.” Also, consider matching the faucet finish to other accessories in the space, such as the towel ring, mirror frame, and light fixture.
The key to a weatherproof, attractive glass block window both inside and out is to encase it in a custom-built wooden frame (Fig. A) with inside dimensions that are 1/2 in. taller and wider than the panel itself. That will give you room to adjust and shim the panel exactly and then inject expanding foam between the frame and the panel to lock it into the opening (Photos 3 and 4).
Tile the walls first, then the floor. When tiling around the window, keep the tile about 1/8 in. away from the glass block. Tile the floor, starting by carefully snapping center lines to lay out border strips and field tile. Work from those lines to get evenly spaced tiles throughout the floor. Grout the walls and floors but caulk the inside corners between floors and walls and where walls meet.
Bathroom Renovations Sydney did a superb job from start to finish when I wanted to get my bathroom redesigned and reconstructed. I opted for their traditional bathroom renovations service and the price they quoted was incredible. Despite initial speculations, the entire remodeling was done perfectly and my bathroom looks absolutely exquisite now! I would definitely recommend their home improvement and designing services.
If your room is wider than the shower base, fur in the walls as needed to butt against the ends of the shower base (see Photo 14). Our bathroom is 6 ft. wide, so we added a floor-to-ceiling 2×6 wall at the showerhead end and a shorter 2×6 wall at the opposite end. We made that wall only 43 in. above the floor so we could use the top of the wall to hold shampoo and other shower supplies. The shower base usually comes with a special 2-in. drain fitting that you connect to the drain line (Fig. B).
We understand how important it is to get your renovations completed on time particularly when the bathroom being constructed or renovated is used regularly. This is the reason we allocate professionals who are reliable and efficient to handle your renovations job for you so that all work from the planning to the finishing is completed within your time constraints.
The job of installing our wall-mounted fixtures was tougher than it had to be, thanks to poor and contradictory one-size-fits-all instructions, metric fittings and duplicate and missing mounting parts. Prevent hard-to-fix future problems by test-fitting the actual fixtures when roughing in framing, plumbing and blocking to make sure everything will work out. Then finish the walls. When test-fitting, simulate finished floor and wall surfaces to get the clearances right.
Planning. Both DIY and contractor remodeling jobs depend on good up-front planning in order to control costs and keep things speedy. Some of the key elements include drawing plans (essential if your remodel will involve layout changes to the bathroom), obtaining building permits, signing contracts with any pros you will use and scheduling their time, and sourcing and ordering materials. A general contractor will do most of this work for you (which is why he costs more), but to save money, you can do all the planning work yourself. 
×