Toenail 2×6 blocks in the center of the shower 36 in. above the floor for the shower valve and 6 ft. 6 in. above the floor for the showerhead. Position the valve block so the plastic mud guard on the mixing valve will be flush with the finished wall surface. Attach the shower supply line and the hot and cold supply lines to the valve. Clamp the valve body and shower supply line to the blocks with copper pipe straps. Run copper water supplies to the new locations for the sink and toilet.
The job of installing our wall-mounted fixtures was tougher than it had to be, thanks to poor and contradictory one-size-fits-all instructions, metric fittings and duplicate and missing mounting parts. Prevent hard-to-fix future problems by test-fitting the actual fixtures when roughing in framing, plumbing and blocking to make sure everything will work out. Then finish the walls. When test-fitting, simulate finished floor and wall surfaces to get the clearances right.
Here at Bathroom Renovations Sydney, we offer you some of the most economical packages for toilet renovations. The exact cost of installing a shower can depend on whether you will be purchasing the shower through us, or on your own as well as whether the renovation will need any kind of structural/fitting changes to install the shower. To get an exact quote for installing a shower, please reach out to us with your requirements.
Tear out the existing piping (Photos 5 and 6). Then frame the 2×6 walls that will contain the new plumbing and the opposite end of the shower base (Photos 8, 9 and 14). It’s easiest to nail the bottom plate to the floor and the top plate to the ceiling, then fill in the studs one at a time by toenailing them in at the top and bottom. Stack the studs directly in front of the old ones wherever possible. Space the studs in the center of the shower about 12 in. apart to leave room for the shower valve and showerhead. The studs behind the toilet should be spaced exactly 19-3/4 in. apart for securing this toilet chair carrier (Photos 8 and 15).

Before starting to renovate a bathroom, consider to determine your budget. The cost of remodeling a bathroom depends on the size, started from small to medium or master. Not only the bathroom, but the fixture price also depends on its size. Moreover, the fixture elements that you will probably need while remodeling a bathroom are new shower or bath, countertops, lighting, flooring, and cabinets.
The cheapest route of all also typically the one that takes the most time: doing all or most of the work yourself. A very (very) skilled DIYer with plenty of time and a group of willing friends and helpers may be able to finish a bathroom remodel nearly as fast as a general contractor, but very few homeowners fall into that category. And there is the issue of quality: good contractors will do the job professionally, while many DIY installations will be recognizable as the work of an amateur. 
×