This elegant bathroom from Sugar & Cloth features Midas-approved gold fixtures throughout the design. Not only does the gold give the bathroom a classic look, but by keeping the accessories uniform throughout the space, the room feels cohesive and meaningfully decorated. One of the best ways to make a small bathroom feel inviting is to smartly decorate every nook and cranny.
Interior bathroom demolition costs $1,000 to $2,300. Prices can go higher if you’re removing and moving walls to create a different footprint. For the experienced DIYer, this is a good place to save money by doing it yourself or assisting the contractor. However, demo can get expensive quickly if you take out a load bearing wall, cut electrical lines or break a water pipe. Avoid the risk by hiring a pro.
A DIY bathroom makeover is not complete without new floor tiles. But before you start grinding away with the grouting, use a mason’s chalk line to mark reference lines perpendicular (at a 90-degree angle) to the wall with the longest continuous line. This will allow you to keep your tiles in a straight line, avoiding the dreaded crooked tiling job.
Adding wainscoting to your bathroom creates a more classic look and lends a bit of visual interest. For a more design-forward approach, invest in a graphic wallpaper, such as this tropical one seen on Design Sponge. By keeping the wainscoting white and neutral, the bold print adds a pop of personality without overwhelming the small space. The white pedestal sink not only uses less floor space than a large vanity but also blends in with the paneling to create an optical illusion of more space.
Tear out the existing piping (Photos 5 and 6). Then frame the 2×6 walls that will contain the new plumbing and the opposite end of the shower base (Photos 8, 9 and 14). It’s easiest to nail the bottom plate to the floor and the top plate to the ceiling, then fill in the studs one at a time by toenailing them in at the top and bottom. Stack the studs directly in front of the old ones wherever possible. Space the studs in the center of the shower about 12 in. apart to leave room for the shower valve and showerhead. The studs behind the toilet should be spaced exactly 19-3/4 in. apart for securing this toilet chair carrier (Photos 8 and 15).
The wall behind the toilet can be almost any height. For a standard toilet height of 15 in., make the wall a minimum height of 43 in. If you’d like a higher toilet, make the wall that much higher. Or, make the wall go all the way to the ceiling. We built a short wall to conserve space and to create a shelf and a mirror alcove. The wall at the opposite end of the shower can be any height as well. We made it the same height as the toilet/sink wall so we could line up the accent tile and make a convenient shower shelf.
The “Gorilla Style” Method: Bend a metal coat hanger so that the hanger portion forms a hook. This is a great way to fish out any clumps of slimy hair that might be clogging your shower drain. With an old plastic grocery bag acting as your catch-all for the mess, quickly tie the bag shut when all the gunk is gone to contain the odor. Pour baking soda down the shower drain. Then, add vinegar and immediately plug the shower drain with the rag. Wait 20 minutes for tougher clogs.
Planning. Both DIY and contractor remodeling jobs depend on good up-front planning in order to control costs and keep things speedy. Some of the key elements include drawing plans (essential if your remodel will involve layout changes to the bathroom), obtaining building permits, signing contracts with any pros you will use and scheduling their time, and sourcing and ordering materials. A general contractor will do most of this work for you (which is why he costs more), but to save money, you can do all the planning work yourself. 
With it's black and white tiles and lavender walls, it looks like two bathrooms were squeezed into one. There was definitely a whole lot of clashing visions going on here. 

Related: How to Refresh Your Bathroom for Less Than $100

As with the cost, it is difficult to estimate the exact time that it will take for a bathroom renovations project since it depends on a variety of factors such as the size and requirements of the renovation. On average though, it takes anywhere between 2 – 4 weeks to complete a bathroom renovation with shorter projects that just need replacement/upgrade of appliances/fittings taking as little as 1 week. Our team here at Bathroom Renovations Sydney is highly efficient and ensures that minimum time is needed for your renovations project.


Drywall installation. Most remodeling jobs will involve opening up at least some of the walls and ceilings, and after the plumbing and wiring rough-ins have been inspected and passed, a drywall pro or DIYer can then install and finish the drywall. This is somewhat tedious work, but it is well within the skill level of most DIYers. The money-savings here are modest, though, because professional drywall installation is not pricey. 


The key to a weatherproof, attractive glass block window both inside and out is to encase it in a custom-built wooden frame (Fig. A) with inside dimensions that are 1/2 in. taller and wider than the panel itself. That will give you room to adjust and shim the panel exactly and then inject expanding foam between the frame and the panel to lock it into the opening (Photos 3 and 4).
Tear out the existing piping (Photos 5 and 6). Then frame the 2×6 walls that will contain the new plumbing and the opposite end of the shower base (Photos 8, 9 and 14). It’s easiest to nail the bottom plate to the floor and the top plate to the ceiling, then fill in the studs one at a time by toenailing them in at the top and bottom. Stack the studs directly in front of the old ones wherever possible. Space the studs in the center of the shower about 12 in. apart to leave room for the shower valve and showerhead. The studs behind the toilet should be spaced exactly 19-3/4 in. apart for securing this toilet chair carrier (Photos 8 and 15).
Yes, all of our bathroom renovations projects are covered under a 7-year guarantee. We work with the best tradesmen and professionals in the industry to ensure that all work is done in compliance with the Australian building codes but at the same time, also provide guarantees for all work that we do. We are here to ensure the maximum satisfaction of our customers.
Although this new bathroom is a bit smaller because of additional plumbing walls, it appears larger. Substituting a shower for the bathtub, adding a large mirror, and using a wall-hung sink and toilet all contribute to the spacious feeling. This big-picture stuff is striking, but it’s the step-by-step details that make this small bathroom remodel work. We cover the little kernels of information that will help your project go more smoothly and with fewer headaches.

My experience with Bathroom Renovations Sydney was quite pleasant. The team of workers they sent over were very knowledgeable and professional and had everything planned out from the demolition to the finishing. Each subcontractor in their team was capable, courteous, and cooperative. The consistency in their work through the renovation and the quality of work that they delivered was simply exceptional. I am very delighted with the results and my bathroom looks as great as well. Thank you so much for all the hard work!
Bathroom remodels provide 60 to 70 percent resale returns as a home improvement project. However, this project isn’t cheap. It is essential to plan your remodeling ideas ahead of time. Then, hire a remodeling contractor for the job. Ask questions, set realistic expectations, get accurate cost estimates and budgeting from the start. Also spend time learning how to work with a bathroom contractor.
×